ITAC Assessment: MA0601
ITAC logo
ITAC Assessment: MA0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Specialty paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 50,000
ft2
Annual Production 52,000
ton
Production Hrs. Annual 8,590
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,327,542 39,192,000
kWh
Electricity Demand $274,478 82,674
kW-mo/yr
Electricity Fees $157,628 -
Fuel Oil #6 $1,712,960 193,549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $241,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $164,538

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $147,022 $129,390 $144,452
1,819,300
kWh
$2,570
-
kW-mo/yr
-
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $71,974 $10,118 - - $71,974
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,368 $24,444 $9,305
117,200
kWh
$63
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,148 $18,975 $7,829
98,600
kWh
$319
-
kW-mo/yr
-
05 2.4131: Size electric motors for peak operating efficiency $5,090 $2,300 $5,090
64,100
kWh
- -
TOTAL RECOMMENDED $241,602 $185,227 $166,676
2,099,200
kWh
$2,952
-
kW-mo/yr
$71,974
-
MMBtu
TOTAL IMPLEMENTED $164,538 $172,809 $161,586
2,035,100
kWh
$2,952
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs