ITAC Assessment: MA0598
ITAC logo
ITAC Assessment: MA0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Printed literature
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 213,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $698,382 9,103,808
kWh
Electricity Demand $204,517 25,125
kW-mo/yr
Electricity Fees $33 -
Natural Gas $175,648 21,297
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,968

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $25,324 $45,333 - $25,324
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $19,748 $1,125 $16,353
173,600
kWh
$3,395
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,315 $18,065 $10,315
109,500
kWh
- -
04 2.2511: Insulate bare equipment $4,500 $4,314 - - $4,500
-
MMBtu
05 2.6224: Schedule baking times of small and large components $2,571 $3,000 $2,571
27,300
kWh
- -
06 2.4131: Size electric motors for peak operating efficiency $716 $500 $716
7,600
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $405 $300 $405
4,300
kWh
- -
TOTAL RECOMMENDED $63,579 $72,637 $30,360
322,300
kWh
$28,719
-
kW-mo/yr
$4,500
-
MMBtu
TOTAL IMPLEMENTED $34,968 $23,804 $27,073
287,400
kWh
$3,395
-
kW-mo/yr
$4,500
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs