Assessment Year | 2006 |
---|---|
Principal Product | Printed literature |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
213,000
ft2
|
Annual Production | 80,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $698,382 | 9,103,808 |
kWh
|
$0.077 |
Electricity Demand | $204,517 | 25,125 |
kW-mo/yr
|
$8.14 |
Electricity Fees | $33 | - |
|
- |
Natural Gas | $175,648 | 21,297 |
MMBtu
|
$8.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,968 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $25,324 | $45,333 | - |
$25,324
-
kW-mo/yr
|
- | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $19,748 | $1,125 |
$16,353
173,600
kWh
|
$3,395
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,315 | $18,065 |
$10,315
109,500
kWh
|
- | - | |
04 | 2.2511: Insulate bare equipment | $4,500 | $4,314 | - | - |
$4,500
-
MMBtu
|
|
05 | 2.6224: Schedule baking times of small and large components | $2,571 | $3,000 |
$2,571
27,300
kWh
|
- | - | |
06 | 2.4131: Size electric motors for peak operating efficiency | $716 | $500 |
$716
7,600
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $405 | $300 |
$405
4,300
kWh
|
- | - | |
TOTAL RECOMMENDED | $63,579 | $72,637 |
$30,360
322,300
kWh
|
$28,719
-
kW-mo/yr
|
$4,500
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,968 | $23,804 |
$27,073
287,400
kWh
|
$3,395
-
kW-mo/yr
|
$4,500
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs