ITAC Assessment: MA0597
ITAC logo
ITAC Assessment: MA0597
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Hot stam foil
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3497: Metal Foil and Leaf
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 60,000
ft2
Annual Production 937,500
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,519 4,778,250
kWh
Electricity Demand $56,108 10,889
kW-mo/yr
Electricity Fees $847 -
Natural Gas $148,427 13,429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,092

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $25,107 $85,300 $25,107
273,500
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,984 $17,660 $8,555
93,200
kWh
$1,429
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $5,643 $17,818 - - $5,643
-
MMBtu
-
04 2.7314: Reduce ventilation air $4,902 $1,000 - - $4,902
-
MMBtu
-
05 4.113: Install refrigeration system to cool product $3,292 $19,000 $(-83.0)
(-900)
kWh
- - $3,375
06 2.2511: Insulate bare equipment $2,161 $668 - - $2,161
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,402 - $1,202
13,100
kWh
$200
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $909 $775 $909
9,900
kWh
- - -
TOTAL RECOMMENDED $53,400 $142,221 $35,690
388,800
kWh
$1,629
-
kW-mo/yr
$12,706
-
MMBtu
$3,375
TOTAL IMPLEMENTED $24,092 $37,146 $9,757
106,300
kWh
$1,629
-
kW-mo/yr
$12,706
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs