ITAC Assessment: MA0595
ITAC logo
ITAC Assessment: MA0595
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Hardwood lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 126,600
ft2
Annual Production 7,500
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,887 2,966,641
kWh
Electricity Demand $104,547 7,620
kW-mo/yr
Natural Gas $55,411 2,719
MMBtu
Wood $3,710 1,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,853 $158,280 $23,998
297,000
kWh
$8,855
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,311 $27,000 $6,230
77,100
kWh
$3,081
-
kW-mo/yr
-
03 2.4323: Use optimum size and capacity equipment $5,019 $8,507 $2,521
31,200
kWh
$2,498
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $935 - $630
7,800
kWh
$305
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $62 $150 - - $62
-
MMBtu
TOTAL RECOMMENDED $48,180 $193,937 $33,379
413,100
kWh
$14,739
-
kW-mo/yr
$62
-
MMBtu
TOTAL IMPLEMENTED $10,308 $27,150 $6,860
84,900
kWh
$3,386
-
kW-mo/yr
$62
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs