Assessment Year | 2005 |
---|---|
Principal Product | Anodized, Non Chromate Conversion Coated material |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 28 |
Plant Area |
21,600
ft2
|
Annual Production | 2,000
lb
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,811 | 507,600 |
kWh
|
$0.076 |
Electricity Demand | $25,344 | 2,916 |
kW-mo/yr
|
$8.69 |
Electricity Fees | $1,616 | - |
|
- |
Natural Gas | $97,080 | 10,602 |
MMBtu
|
$9.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,636 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,830 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $3,404 | $2,197 | - | - |
$3,404
-
MMBtu
|
|
02 | 2.2163: Use minimum steam operating pressure | $2,294 | $500 | - | - |
$2,294
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,994 | $1,242 |
$200
2,600
kWh
|
- |
$1,794
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,132 | $4,668 |
$1,132
14,700
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $812 | $2,599 |
$555
7,200
kWh
|
$257
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $9,636 | $11,206 |
$1,887
24,500
kWh
|
$257
-
kW-mo/yr
|
$7,492
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,830 | $7,365 |
$1,132
14,700
kWh
|
- |
$5,698
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs