ITAC Assessment: MA0574
ITAC logo
ITAC Assessment: MA0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Rolled copper and brass plates
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 600,000
ft2
Annual Production 5,200,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $625,556 3,638,200
kWh
Electricity Demand $107,657 19,900
kW-mo/yr
Natural Gas $251,654 38,033
MMBtu
Fuel Oil #2 $269,000 23,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $698,132 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $328,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #6 Savings
01 2.7231: Use radiant heater for spot heating $179,823 $140,865 - $(-24,956.0)
-
MMBtu
$204,779
-
MMBtu
-
02 2.2531: Re-size charging openings or add movable cover or door $140,952 $230,000 - $140,952
-
MMBtu
- -
03 2.1331: Burn a less expensive grade of fuel $349,295 $54,400 - - $224,092
-
MMBtu
$125,203
-
MMBtu
04 2.3212: Optimize plant power factor $20,725 $20,215 $20,725
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $3,466 $1,801 - - $3,466
-
MMBtu
-
06 2.2511: Insulate bare equipment $2,911 $5,770 - $2,911
-
MMBtu
- -
07 2.2531: Re-size charging openings or add movable cover or door $960 - - $960
-
MMBtu
- -
TOTAL RECOMMENDED $698,132 $453,051 $20,725
-
kW-mo/yr
$119,867
-
MMBtu
$432,337
-
MMBtu
$125,203
-
MMBtu
TOTAL IMPLEMENTED $328,112 $378,436 - $119,867
-
MMBtu
$208,245
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #6 Savings