Assessment Year | 2005 |
---|---|
Principal Product | Rolled copper and brass plates |
NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
600,000
ft2
|
Annual Production | 5,200,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $625,556 | 3,638,200 |
kWh
|
$0.17 |
Electricity Demand | $107,657 | 19,900 |
kW-mo/yr
|
$5.41 |
Natural Gas | $251,654 | 38,033 |
MMBtu
|
$6.62 |
Fuel Oil #2 | $269,000 | 23,865 |
MMBtu
|
$11.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $698,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $328,112 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $179,823 | $140,865 | - |
$(-24,956.0)
-
MMBtu
|
$204,779
-
MMBtu
|
- | |
02 | 2.2531: Re-size charging openings or add movable cover or door | $140,952 | $230,000 | - |
$140,952
-
MMBtu
|
- | - | |
03 | 2.1331: Burn a less expensive grade of fuel | $349,295 | $54,400 | - | - |
$224,092
-
MMBtu
|
$125,203
-
MMBtu
|
|
04 | 2.3212: Optimize plant power factor | $20,725 | $20,215 |
$20,725
-
kW-mo/yr
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $3,466 | $1,801 | - | - |
$3,466
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $2,911 | $5,770 | - |
$2,911
-
MMBtu
|
- | - | |
07 | 2.2531: Re-size charging openings or add movable cover or door | $960 | - | - |
$960
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $698,132 | $453,051 |
$20,725
-
kW-mo/yr
|
$119,867
-
MMBtu
|
$432,337
-
MMBtu
|
$125,203
-
MMBtu
|
||
TOTAL IMPLEMENTED | $328,112 | $378,436 | - |
$119,867
-
MMBtu
|
$208,245
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs