Assessment Year | 2004 |
---|---|
Principal Product | Thermal coatings |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
65,000
ft2
|
Annual Production | 168,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $331,174 | 5,017,790 |
kWh
|
$0.066 |
Electricity Demand | $135,061 | 17,655 |
kW-mo/yr
|
$7.65 |
Electricity Fees | $13,600 | - |
|
- |
Natural Gas | $253,193 | 26,274 |
MMBtu
|
$9.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,930 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,930 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $42,752 | $238,150 |
$35,316
497,400
kWh
|
$7,436
-
kW-mo/yr
|
- | |
02 | 2.7245: Use direct air supply to exhaust hoods | $32,756 | $23,710 |
$756
10,500
kWh
|
- |
$32,000
-
MMBtu
|
|
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,875 | $1,200 | - |
$5,875
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $317 | $256 |
$317
4,800
kWh
|
- | - | |
05 | 2.1213: Direct warmest air to combustion intake | $230 | $175 | - | - |
$230
-
MMBtu
|
|
TOTAL RECOMMENDED | $81,930 | $263,491 |
$36,389
512,700
kWh
|
$13,311
-
kW-mo/yr
|
$32,230
-
MMBtu
|
||
TOTAL IMPLEMENTED | $81,930 | $263,491 |
$36,389
512,700
kWh
|
$13,311
-
kW-mo/yr
|
$32,230
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs