ITAC Assessment: MA0560
ITAC logo
ITAC Assessment: MA0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Thermal coatings
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 65,000
ft2
Annual Production 168,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,174 5,017,790
kWh
Electricity Demand $135,061 17,655
kW-mo/yr
Electricity Fees $13,600 -
Natural Gas $253,193 26,274
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2622: Replace existing chiller with high efficiency model $42,752 $238,150 $35,316
497,400
kWh
$7,436
-
kW-mo/yr
-
02 2.7245: Use direct air supply to exhaust hoods $32,756 $23,710 $756
10,500
kWh
- $32,000
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,875 $1,200 - $5,875
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $317 $256 $317
4,800
kWh
- -
05 2.1213: Direct warmest air to combustion intake $230 $175 - - $230
-
MMBtu
TOTAL RECOMMENDED $81,930 $263,491 $36,389
512,700
kWh
$13,311
-
kW-mo/yr
$32,230
-
MMBtu
TOTAL IMPLEMENTED $81,930 $263,491 $36,389
512,700
kWh
$13,311
-
kW-mo/yr
$32,230
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs