ITAC Assessment: BD0303
ITAC logo
ITAC Assessment: BD0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Wooden Carts, Boxes, Pallets
NAICS 238130: Framing Contractors
SIC 2448: Wood Pallets and Skids
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 102,000
ft2
Annual Production 350
pieces
Production Hrs. Annual 5,304
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,335 958,860
kWh
Electricity Demand $12,814 1,745
kW-mo/yr
Natural Gas $21,427 2,373
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $9,279 $8,400 - - $9,279
-
MMBtu
02 2.4113: Install motor voltage controller on lightly loaded motors $2,839 $4,020 $2,246
152
kWh
$593
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,511 $1,500 $1,862
126
kWh
$649
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $2,403 $400 - - $2,403
-
MMBtu
05 2.4314: Use synthetic lubricant $1,275 $1,500 $759
51
kWh
$516
-
kW-mo/yr
-
06 2.7134: Use photocell controls $903 $2,000 $492
33
kWh
$411
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $168 $225 $140
10
kWh
$28
-
kW-mo/yr
-
TOTAL RECOMMENDED $19,378 $18,045 $5,499
372
kWh
$2,197
-
kW-mo/yr
$11,682
-
MMBtu
TOTAL IMPLEMENTED $6,189 $3,400 $2,621
177
kWh
$1,165
-
kW-mo/yr
$2,403
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs