Assessment Year | 2006 |
---|---|
Principal Product | Wooden Carts, Boxes, Pallets |
NAICS | 238130: Framing Contractors |
SIC | 2448: Wood Pallets and Skids |
Sales Range | $10 M to 50M |
# of Employees | 61 |
Plant Area |
102,000
ft2
|
Annual Production | 350
pieces
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,335 | 958,860 |
kWh
|
$0.050 |
Electricity Demand | $12,814 | 1,745 |
kW-mo/yr
|
$7.34 |
Natural Gas | $21,427 | 2,373 |
MMBtu
|
$9.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,378 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,189 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $9,279 | $8,400 | - | - |
$9,279
-
MMBtu
|
|
02 | 2.4113: Install motor voltage controller on lightly loaded motors | $2,839 | $4,020 |
$2,246
152
kWh
|
$593
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,511 | $1,500 |
$1,862
126
kWh
|
$649
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,403 | $400 | - | - |
$2,403
-
MMBtu
|
|
05 | 2.4314: Use synthetic lubricant | $1,275 | $1,500 |
$759
51
kWh
|
$516
-
kW-mo/yr
|
- | |
06 | 2.7134: Use photocell controls | $903 | $2,000 |
$492
33
kWh
|
$411
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $168 | $225 |
$140
10
kWh
|
$28
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $19,378 | $18,045 |
$5,499
372
kWh
|
$2,197
-
kW-mo/yr
|
$11,682
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,189 | $3,400 |
$2,621
177
kWh
|
$1,165
-
kW-mo/yr
|
$2,403
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs