ITAC Assessment: MA0557
ITAC logo
ITAC Assessment: MA0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Metal plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 16
Plant Area 28,000
ft2
Annual Production 3,600
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,272 657,280
kWh
Natural Gas $49,709 7,485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,132

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $5,922 $25,100 - $5,922
-
MMBtu
02 2.2511: Insulate bare equipment $5,528 $3,118 - $5,528
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,428 $3,450 $2,428
28,900
kWh
-
04 2.2511: Insulate bare equipment $1,706 $708 - $1,706
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $470 $1,340 $470
5,600
kWh
-
TOTAL RECOMMENDED $16,054 $33,716 $2,898
34,500
kWh
$13,156
-
MMBtu
TOTAL IMPLEMENTED $10,132 $8,616 $2,898
34,500
kWh
$7,234
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs