ITAC Assessment: MA0554
ITAC logo
ITAC Assessment: MA0554
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Flat tissue paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 80,000
ft2
Annual Production 24,000
ton
Production Hrs. Annual 8,472
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,739,010 25,486,800
kWh
Electricity Demand $394,283 42,748
kW-mo/yr
Electricity Fees $3,741 -
Fuel Oil #6 $1,074,251 222,900
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,060,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Wood Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $872,428 $2,632,200 n/a $216,845
3,188,900
kWh
$42,525
-
kW-mo/yr
$1,136,051
-
MMBtu
$(-522,993.0)
-
MMBtu
02 2.2437: Recover waste heat from equipment $119,550 $175,000 $(-17,190.0)
(-252,740)
kWh
$(-3,400.0)
-
kW-mo/yr
$140,140
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $48,636 $76,341 - - $48,636
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,697 $11,100 $9,779
143,600
kWh
$1,918
-
kW-mo/yr
- -
05 4.652: Replace existing equipment with more suitable substitutes $6,330 $8,961 $5,290
77,700
kWh
$1,040
-
kW-mo/yr
- -
06 2.2123: Insulate feedwater tank $1,784 $1,300 - - $1,784
-
MMBtu
-
TOTAL RECOMMENDED $1,060,425 $2,904,902 $214,724
3,157,460
kWh
$42,083
-
kW-mo/yr
$1,326,611
-
MMBtu
$(-522,993.0)
-
MMBtu
TOTAL IMPLEMENTED $8,114 $10,261 $5,290
77,700
kWh
$1,040
-
kW-mo/yr
$1,784
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs