| Assessment Year | 2004 |
|---|---|
| Principal Product | Flat tissue paper |
| NAICS | 322121: Paper (except Newsprint) Mills |
| SIC | 2621: Paper Mills |
| Sales Range | $50 M to 100M |
| # of Employees | 125 |
| Plant Area |
80,000
ft2
|
| Annual Production | 24,000
ton
|
| Production Hrs. Annual | 8,472
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,739,010 | 25,486,800 |
kWh
|
$0.068 |
| Electricity Demand | $394,283 | 42,748 |
kW-mo/yr
|
$9.22 |
| Electricity Fees | $3,741 | - |
|
- |
| Fuel Oil #6 | $1,074,251 | 222,900 |
MMBtu
|
$4.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,060,425 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,114 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Wood Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $872,428 | $2,632,200 | n/a |
$216,845
3,188,900
kWh
|
$42,525
-
kW-mo/yr
|
$1,136,051
-
MMBtu
|
$(-522,993.0)
-
MMBtu
|
| 02 | 2.2437: Recover waste heat from equipment | $119,550 | $175,000 |
$(-17,190.0)
(-252,740)
kWh
|
$(-3,400.0)
-
kW-mo/yr
|
$140,140
-
MMBtu
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $48,636 | $76,341 | - | - |
$48,636
-
MMBtu
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,697 | $11,100 |
$9,779
143,600
kWh
|
$1,918
-
kW-mo/yr
|
- | - | |
| 05 | 4.652: Replace existing equipment with more suitable substitutes | $6,330 | $8,961 |
$5,290
77,700
kWh
|
$1,040
-
kW-mo/yr
|
- | - | |
| 06 | 2.2123: Insulate feedwater tank | $1,784 | $1,300 | - | - |
$1,784
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $1,060,425 | $2,904,902 |
$214,724
3,157,460
kWh
|
$42,083
-
kW-mo/yr
|
$1,326,611
-
MMBtu
|
$(-522,993.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,114 | $10,261 |
$5,290
77,700
kWh
|
$1,040
-
kW-mo/yr
|
$1,784
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Wood Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs