ITAC Assessment: MA0531
ITAC logo
ITAC Assessment: MA0531
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Cowhide split and top-grade leather
NAICS 316110: Leather and Hide Tanning and Finishing
SIC 3111: Leather Tanning and Finishing
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area 60,000
ft2
Annual Production 49,000
thousand feet
Production Hrs. Annual 2,328
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,262 1,194,327
kWh
Electricity Demand $52,025 4,592
kW-mo/yr
Electricity Fees $5,810 -
LPG $22,184 2,116
MMBtu
Fuel Oil #4 $48,517 10,296
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Increase in Production Savings
01 4.114: Add/modify equipment to improve drying process $31,336 $37,543 n/a - - - $31,336
02 4.652: Replace existing equipment with more suitable substitutes $21,438 $43,874 n/a - - - $21,438
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,738 $6,375 n/a $3,339
40,723
kWh
$1,399
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $2,667 $4,205 n/a - $2,667
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,532 $6,800 n/a $1,786
21,790
kWh
$746
-
kW-mo/yr
- -
06 2.2136: Install / repair insulation on steam lines $445 $383 n/a - - $445
-
MMBtu
-
TOTAL RECOMMENDED $63,156 $99,180 $5,125
62,513
kWh
$4,812
-
kW-mo/yr
$445
-
MMBtu
$52,774
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs