Assessment Year | 2002 |
---|---|
Principal Product | Abrasive Grinding wheels |
NAICS |
n/a
|
SIC | 3291: Abrasive Products |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
62,000
ft2
|
Annual Production | 130,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $499,717 | 7,676,160 |
kWh
|
$0.065 |
Electricity Demand | $164,468 | 28,114 |
kW-mo/yr
|
$5.85 |
Natural Gas | $275,845 | 45,453 |
MMBtu
|
$6.07 |
Other Energy | $210,698 | 42,498 |
MMBtu
|
$4.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,044 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,797 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $31,997 | - |
$(-15,515.0)
(-254,600)
kWh
|
$(-2,833.0)
-
kW-mo/yr
|
$41,085
-
MMBtu
|
- |
$9,260
-
Tgal
|
|
02 | 4.212: Adopt in-house material generation | $14,755 | $45,000 |
$(-8,512.0)
(-139,651)
kWh
|
- | - | $23,267 | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,776 | $16,000 | n/a |
$5,729
93,996
kWh
|
$1,047
-
kW-mo/yr
|
- | - | - |
04 | 2.6242: Minimize operation of equipment maintained in standby condition | $3,719 | $13,000 | n/a |
$3,140
51,521
kWh
|
$579
-
kW-mo/yr
|
- | - | - |
05 | 2.7111: Reduce illumination to minimum necessary levels | $4,117 | $2,000 |
$4,117
70,122
kWh
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $501 | $158 | - | - |
$501
-
MMBtu
|
- | - | |
07 | 2.2511: Insulate bare equipment | $179 | $750 | - | - |
$179
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $62,044 | $76,908 |
$(-11,041.0)
(-178,612)
kWh
|
$(-1,207.0)
-
kW-mo/yr
|
$41,765
-
MMBtu
|
$23,267 |
$9,260
-
Tgal
|
||
TOTAL IMPLEMENTED | $4,797 | $2,908 |
$4,117
70,122
kWh
|
- |
$680
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs