ITAC Assessment: MA0524
ITAC logo
ITAC Assessment: MA0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Abrasive Grinding wheels
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 62,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,717 7,676,160
kWh
Electricity Demand $164,468 28,114
kW-mo/yr
Natural Gas $275,845 45,453
MMBtu
Other Energy $210,698 42,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,797

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $31,997 - $(-15,515.0)
(-254,600)
kWh
$(-2,833.0)
-
kW-mo/yr
$41,085
-
MMBtu
- $9,260
-
Tgal
02 4.212: Adopt in-house material generation $14,755 $45,000 $(-8,512.0)
(-139,651)
kWh
- - $23,267 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,776 $16,000 n/a $5,729
93,996
kWh
$1,047
-
kW-mo/yr
- - -
04 2.6242: Minimize operation of equipment maintained in standby condition $3,719 $13,000 n/a $3,140
51,521
kWh
$579
-
kW-mo/yr
- - -
05 2.7111: Reduce illumination to minimum necessary levels $4,117 $2,000 $4,117
70,122
kWh
- - - -
06 2.2511: Insulate bare equipment $501 $158 - - $501
-
MMBtu
- -
07 2.2511: Insulate bare equipment $179 $750 - - $179
-
MMBtu
- -
TOTAL RECOMMENDED $62,044 $76,908 $(-11,041.0)
(-178,612)
kWh
$(-1,207.0)
-
kW-mo/yr
$41,765
-
MMBtu
$23,267 $9,260
-
Tgal
TOTAL IMPLEMENTED $4,797 $2,908 $4,117
70,122
kWh
- $680
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs