ITAC Assessment: MA0517
ITAC logo
ITAC Assessment: MA0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Teflon and metal hose products
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $100
M
to 500
M
# of Employees 545
Plant Area 250,000
ft2
Annual Production 15,500,000
lb
Production Hrs. Annual 6,552
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,219 14,199,135
kWh
Electricity Demand $354,580 26,202
kW-mo/yr
Electricity Fees $174,113 -
Natural Gas $210,373 32,079
MMBtu
Fuel Oil #2 $11,794 1,496
MMBtu
Fuel Oil #4 $138,878 27,933
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,265 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings One-time Revenue or Avoided Cost Savings
01 2.2514: Cover open tanks $30,107 $4,262 - $30,107
-
MMBtu
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,697 $33,800 $21,174
428,062
kWh
- $(-9,477.0)
-
MMBtu
-
03 2.2212: Use minimum safe oven ventilation $7,427 $2,100 $7,095
147,325
kWh
- $332
-
MMBtu
-
04 4.821: Pay bills on time to avoid late fees $6,528 - - - - $6,528
05 2.2511: Insulate bare equipment $6,349 $9,636 - $6,349
-
MMBtu
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,140 $5,200 $2,140
43,274
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $1,164 $2,500 $1,164
28,151
kWh
- - -
08 2.6242: Minimize operation of equipment maintained in standby condition $853 $1,515 $853
19,691
kWh
- - -
TOTAL RECOMMENDED $66,265 $59,013 $32,426
666,503
kWh
$36,456
-
MMBtu
$(-9,145.0)
-
MMBtu
$6,528
TOTAL IMPLEMENTED $54,568 $25,213 $11,252
238,441
kWh
$36,456
-
MMBtu
$332
-
MMBtu
$6,528
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs