Assessment Year | 2002 |
---|---|
Principal Product | Specialty Papers and boards |
NAICS |
n/a
|
SIC | 2631: Paperboard Mills |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
52,000
ft2
|
Annual Production | 1,400,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,408 | 2,062,200 |
kWh
|
$0.078 |
Electricity Demand | $54,840 | 8,272 |
kW-mo/yr
|
$6.63 |
Electricity Fees | $1,260 | - |
|
- |
Natural Gas | $56,442 | 5,690 |
MMBtu
|
$9.92 |
Fuel Oil #6 | $119,800 | 22,468 |
MMBtu
|
$5.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,858 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,164 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5111: Convert from indirect to direct fired systems | $16,518 | $13,775 | n/a | - |
$14,496
-
MMBtu
|
$2,022
-
MMBtu
|
- |
02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $5,976 | $7,800 | - |
$5,976
-
MMBtu
|
- | - | |
03 | 2.8112: Combine utility meters | $2,200 | $6,470 | - | - | - | $2,200 | |
04 | 2.5123: Reduce fluid flow rates | $1,849 | - |
$1,849
23,705
kWh
|
- | - | - | |
05 | 2.7132: Install timers on light switches in little used areas | $1,619 | - |
$1,619
20,757
kWh
|
- | - | - | |
06 | 2.2122: Install / repair insulation on condensate lines | $1,604 | $1,792 | - | - |
$1,604
-
MMBtu
|
- | |
07 | 2.4322: Use or replace with energy efficient substitutes | $1,382 | - | - | - |
$1,382
-
MMBtu
|
- | |
08 | 2.2163: Use minimum steam operating pressure | $960 | - | - | - |
$960
-
MMBtu
|
- | |
09 | 2.7221: Lower temperature during the winter season and vice-versa | $750 | - | - | - |
$750
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $32,858 | $29,837 |
$3,468
44,462
kWh
|
$20,472
-
MMBtu
|
$6,718
-
MMBtu
|
$2,200 | ||
TOTAL IMPLEMENTED | $8,164 | $1,792 |
$3,468
44,462
kWh
|
- |
$4,696
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs