ITAC Assessment: MA0510
ITAC logo
ITAC Assessment: MA0510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Specialty Papers and boards
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 52,000
ft2
Annual Production 1,400,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,408 2,062,200
kWh
Electricity Demand $54,840 8,272
kW-mo/yr
Electricity Fees $1,260 -
Natural Gas $56,442 5,690
MMBtu
Fuel Oil #6 $119,800 22,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.5111: Convert from indirect to direct fired systems $16,518 $13,775 n/a - $14,496
-
MMBtu
$2,022
-
MMBtu
-
02 2.2443: Re-use or recycle hot or cold process exhaust air $5,976 $7,800 - $5,976
-
MMBtu
- -
03 2.8112: Combine utility meters $2,200 $6,470 - - - $2,200
04 2.5123: Reduce fluid flow rates $1,849 - $1,849
23,705
kWh
- - -
05 2.7132: Install timers on light switches in little used areas $1,619 - $1,619
20,757
kWh
- - -
06 2.2122: Install / repair insulation on condensate lines $1,604 $1,792 - - $1,604
-
MMBtu
-
07 2.4322: Use or replace with energy efficient substitutes $1,382 - - - $1,382
-
MMBtu
-
08 2.2163: Use minimum steam operating pressure $960 - - - $960
-
MMBtu
-
09 2.7221: Lower temperature during the winter season and vice-versa $750 - - - $750
-
MMBtu
-
TOTAL RECOMMENDED $32,858 $29,837 $3,468
44,462
kWh
$20,472
-
MMBtu
$6,718
-
MMBtu
$2,200
TOTAL IMPLEMENTED $8,164 $1,792 $3,468
44,462
kWh
- $4,696
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs