| Assessment Year | 2001 |
|---|---|
| Principal Product | Newspaper and printed material |
| NAICS |
n/a
|
| SIC | 2711: Newspapers: Publishing, or Publishing and Printing |
| Sales Range | $10 M to 50M |
| # of Employees | 124 |
| Plant Area |
87,500
ft2
|
| Annual Production | 6,188
ton
|
| Production Hrs. Annual | 7,852
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $171,855 | 2,048,400 |
kWh
|
$0.084 |
| Electricity Demand | $51,954 | 7,222 |
kW-mo/yr
|
$7.19 |
| Electricity Fees | $3,837 | - |
|
- |
| Natural Gas | $15,979 | 1,617 |
MMBtu
|
$9.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $35,103 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,884 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,983 | $6,000 | - |
$11,983
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,653 | $46,540 |
$8,551
109,630
kWh
|
$1,102
-
kW-mo/yr
|
|
| 03 | 2.3212: Optimize plant power factor | $5,838 | $9,990 | - |
$5,838
-
kW-mo/yr
|
|
| 04 | 2.7135: Install occupancy sensors | $4,410 | $2,500 |
$4,410
56,534
kWh
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,219 | $2,162 |
$2,219
27,673
kWh
|
- | |
| 06 | 2.7135: Install occupancy sensors | $736 | $300 |
$736
9,404
kWh
|
- | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $264 | - |
$264
3,375
kWh
|
- | |
| TOTAL RECOMMENDED | $35,103 | $67,492 |
$16,180
206,616
kWh
|
$18,923
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $32,884 | $65,330 |
$13,961
178,943
kWh
|
$18,923
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs