ITAC Assessment: MA0492
ITAC logo
ITAC Assessment: MA0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Roofing fasteners
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 76,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 7,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,882 4,034,880
kWh
Electricity Demand $97,295 8,824
kW-mo/yr
Electricity Fees $27,589 -
Natural Gas $90,242 11,523
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 3.3131: Use evaporation to concentrate material $23,000 $10,000 - - $(-2,500.0)
-
MMBtu
$25,500
-
gal
02 2.7111: Reduce illumination to minimum necessary levels $5,800 $360 $4,300
72,000
kWh
$1,500
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,800 $15,000 $4,800
79,700
kWh
- - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,160 $12,000 $2,800
46,900
kWh
$960
-
kW-mo/yr
$(-1,600.0)
-
MMBtu
-
05 2.7135: Install occupancy sensors $480 $200 $480
8,100
kWh
- - -
TOTAL RECOMMENDED $36,240 $37,560 $12,380
206,700
kWh
$2,460
-
kW-mo/yr
$(-4,100.0)
-
MMBtu
$25,500
-
gal
TOTAL IMPLEMENTED $6,280 $560 $4,780
80,100
kWh
$1,500
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs