Assessment Year | 2001 |
---|---|
Principal Product | Stainless steel legs, Utility cabinets, Grip plates |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
337,000
ft2
|
Annual Production | 462,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $104,012 | 1,628,760 |
kWh
|
$0.064 |
Electricity Demand | $93,043 | 6,798 |
kW-mo/yr
|
$13.69 |
Electricity Fees | $36,387 | - |
|
- |
Natural Gas | $93,026 | 16,177 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,920 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4114: Replace city water with recycled water via cooling tower | $8,700 | - |
$(-900.0)
(-20,300)
kWh
|
$(-1,800.0)
-
kW-mo/yr
|
- |
$6,475
-
Tgal
|
$4,925
-
Tgal
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,400 | $14,000 |
$900
20,000
kWh
|
$2,500
-
kW-mo/yr
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,200 | $11,000 |
$1,200
27,000
kWh
|
$2,000
-
kW-mo/yr
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $2,250 | $12,000 | - | - |
$2,250
-
MMBtu
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,650 | $800 |
$1,650
36,500
kWh
|
- | - | - | - | |
06 | 2.7231: Use radiant heater for spot heating | $1,050 | $6,000 | - | - |
$1,050
-
MMBtu
|
- | - | |
07 | 2.2122: Install / repair insulation on condensate lines | $570 | $2,500 | - | - |
$570
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $20,820 | $46,300 |
$2,850
63,200
kWh
|
$2,700
-
kW-mo/yr
|
$3,870
-
MMBtu
|
$6,475
-
Tgal
|
$4,925
-
Tgal
|
||
TOTAL IMPLEMENTED | $10,920 | $3,300 |
$750
16,200
kWh
|
$(-1,800.0)
-
kW-mo/yr
|
$570
-
MMBtu
|
$6,475
-
Tgal
|
$4,925
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs