ITAC Assessment: MA0483
ITAC logo
ITAC Assessment: MA0483
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Stainless steel legs, Utility cabinets, Grip plates
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 337,000
ft2
Annual Production 462,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,012 1,628,760
kWh
Electricity Demand $93,043 6,798
kW-mo/yr
Electricity Fees $36,387 -
Natural Gas $93,026 16,177
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 3.4114: Replace city water with recycled water via cooling tower $8,700 - $(-900.0)
(-20,300)
kWh
$(-1,800.0)
-
kW-mo/yr
- $6,475
-
Tgal
$4,925
-
Tgal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,400 $14,000 $900
20,000
kWh
$2,500
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,200 $11,000 $1,200
27,000
kWh
$2,000
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $2,250 $12,000 - - $2,250
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,650 $800 $1,650
36,500
kWh
- - - -
06 2.7231: Use radiant heater for spot heating $1,050 $6,000 - - $1,050
-
MMBtu
- -
07 2.2122: Install / repair insulation on condensate lines $570 $2,500 - - $570
-
MMBtu
- -
TOTAL RECOMMENDED $20,820 $46,300 $2,850
63,200
kWh
$2,700
-
kW-mo/yr
$3,870
-
MMBtu
$6,475
-
Tgal
$4,925
-
Tgal
TOTAL IMPLEMENTED $10,920 $3,300 $750
16,200
kWh
$(-1,800.0)
-
kW-mo/yr
$570
-
MMBtu
$6,475
-
Tgal
$4,925
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs