Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Oil tools
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 80,000
ft2
Annual Production 7,200,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,446 2,572,315
kWh
Natural Gas $7,045 893
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $252,458 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $217,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $172,828 $126,720 $172,828
1,754,066
kWh
- - -
02 4.611: Begin a practice of predictive / preventative maintenance $44,703 $4,660 - $44,703 - -
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $14,141 $1,530 $14,141
143,520
kWh
- - -
04 2.7134: Use photocell controls $6,770 $330 $6,770
68,707
kWh
- - -
05 4.611: Begin a practice of predictive / preventative maintenance $3,985 $840 $2,485
25,220
kWh
- - $1,500
06 2.7135: Install occupancy sensors $3,331 $4,260 $3,331
33,808
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,394 $1,330 $1,243
12,615
kWh
- $1,151 -
08 2.7111: Reduce illumination to minimum necessary levels $2,296 $1,210 $2,296
23,299
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,578 $15 $1,578
16,015
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $432 $123 $432
4,386
kWh
- - -
TOTAL RECOMMENDED $252,458 $141,018 $205,104
2,081,636
kWh
$44,703 $1,151 $1,500
TOTAL IMPLEMENTED $217,531 $131,380 $172,828
1,754,066
kWh
$44,703 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs