Assessment Year | 2011 |
---|---|
Principal Product | Oil tools |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
80,000
ft2
|
Annual Production | 7,200,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $253,446 | 2,572,315 |
kWh
|
$0.099 |
Natural Gas | $7,045 | 893 |
MMBtu
|
$7.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $252,458 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $217,531 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $172,828 | $126,720 |
$172,828
1,754,066
kWh
|
- | - | - | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $44,703 | $4,660 | - | $44,703 | - | - | |
03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $14,141 | $1,530 |
$14,141
143,520
kWh
|
- | - | - | |
04 | 2.7134: Use photocell controls | $6,770 | $330 |
$6,770
68,707
kWh
|
- | - | - | |
05 | 4.611: Begin a practice of predictive / preventative maintenance | $3,985 | $840 |
$2,485
25,220
kWh
|
- | - | $1,500 | |
06 | 2.7135: Install occupancy sensors | $3,331 | $4,260 |
$3,331
33,808
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,394 | $1,330 |
$1,243
12,615
kWh
|
- | $1,151 | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $2,296 | $1,210 |
$2,296
23,299
kWh
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,578 | $15 |
$1,578
16,015
kWh
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $432 | $123 |
$432
4,386
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $252,458 | $141,018 |
$205,104
2,081,636
kWh
|
$44,703 | $1,151 | $1,500 | ||
TOTAL IMPLEMENTED | $217,531 | $131,380 |
$172,828
1,754,066
kWh
|
$44,703 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs