Assessment Year | 2001 |
---|---|
Principal Product | Coatings and adhesives |
NAICS |
n/a
|
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
70,000
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $94,813 | 1,483,200 |
kWh
|
$0.064 |
Electricity Demand | $34,688 | 5,200 |
kW-mo/yr
|
$6.67 |
Electricity Fees | $1,204 | - |
|
- |
Natural Gas | $67,934 | 18,139 |
MMBtu
|
$3.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,905 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,865 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $17,820 | $30,000 | - | - | - |
$(-1,050.0)
-
Tgal
|
$(-1,130.0)
-
Tgal
|
$20,000 | |
02 | 2.7224: Reduce space conditioning during non-working hours | $10,390 | $5,500 | - | - |
$10,390
-
MMBtu
|
- | - | - | |
03 | 2.2531: Re-size charging openings or add movable cover or door | $6,380 | $4,800 | - | - |
$6,380
-
MMBtu
|
- | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $3,370 | $7,000 |
$(-770.0)
(-11,000)
kWh
|
$(-140.0)
-
kW-mo/yr
|
$4,280
-
MMBtu
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $910 | $1,315 |
$910
13,000
kWh
|
- | - | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,400 | $10,000 |
$1,400
20,000
kWh
|
- | - | - | - | - | |
07 | 2.2123: Insulate feedwater tank | $375 | $1,000 | - | - |
$375
-
MMBtu
|
- | - | - | |
08 | 2.2123: Insulate feedwater tank | $260 | $1,300 | - | - |
$260
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $40,905 | $60,915 |
$1,540
22,000
kWh
|
$(-140.0)
-
kW-mo/yr
|
$21,685
-
MMBtu
|
$(-1,050.0)
-
Tgal
|
$(-1,130.0)
-
Tgal
|
$20,000 | ||
TOTAL IMPLEMENTED | $32,865 | $44,815 |
$140
2,000
kWh
|
$(-140.0)
-
kW-mo/yr
|
$15,045
-
MMBtu
|
$(-1,050.0)
-
Tgal
|
$(-1,130.0)
-
Tgal
|
$20,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs