ITAC Assessment: MA0473
ITAC logo
ITAC Assessment: MA0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Injection Molding Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 142
Plant Area 78,468
ft2
Annual Production 2,700
ton
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,226 5,665,229
kWh
Electricity Demand $131,789 10,868
kW-mo/yr
Electricity Fees $4,437 -
LPG $755 69
MMBtu
Fuel Oil #1 $6,279 1,357
MMBtu
Fuel Oil #2 $8,787 1,901
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.2628: Utilize a less expensive cooling method $28,890 $140,000 $22,578
459,555
kWh
$6,312
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,924 $129,000 $15,718
313,013
kWh
$9,206
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,760 $1,200 $5,760
117,233
kWh
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $5,180 - $5,180
89,097
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,269 $350 $3,269
66,530
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,779 $7,000 $2,779
56,565
kWh
- -
07 2.7111: Reduce illumination to minimum necessary levels $2,770 $100 $2,060
41,911
kWh
$710
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,440 $3,000 $1,440
29,308
kWh
- -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $936 $5,000 $821
16,706
kWh
$781
-
kW-mo/yr
$(-666.0)
-
MMBtu
10 2.4221: Install compressor air intakes in coolest locations $650 $1,250 $650
13,189
kWh
- -
TOTAL RECOMMENDED $76,598 $286,900 $60,255
1,203,107
kWh
$17,009
-
kW-mo/yr
$(-666.0)
-
MMBtu
TOTAL IMPLEMENTED $72,242 $280,550 $56,724
1,131,301
kWh
$15,518
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs