Assessment Year | 2000 |
---|---|
Principal Product | Lobster storage, packaging and shipping |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $50 M to 100M |
# of Employees | 90 |
Plant Area |
49,173
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 4,056
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $120,837 | 2,046,307 |
kWh
|
$0.059 |
Electricity Demand | $23,217 | 3,896 |
kW-mo/yr
|
$5.96 |
Natural Gas | $14,056 | 1,814 |
MMBtu
|
$7.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,478 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $114 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $7,546 | $18,500 |
$2,536
107,855
kWh
|
- | - | $5,010 | |
02 | 2.2623: Minimize condenser cooling water temperature | $3,105 | $11,000 |
$3,105
53,048
kWh
|
- | - | - | |
03 | 2.2121: Increase amount of condensate returned | $2,804 | $7,200 | - | - |
$2,804
-
MMBtu
|
- | |
04 | 2.2623: Minimize condenser cooling water temperature | $1,548 | $4,000 |
$1,355
23,154
kWh
|
$193
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,361 | $19,740 |
$1,050
17,878
kWh
|
$311
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $114 | $120 |
$114
1,758
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $16,478 | $60,560 |
$8,160
203,693
kWh
|
$504
-
kW-mo/yr
|
$2,804
-
MMBtu
|
$5,010 | ||
TOTAL IMPLEMENTED | $114 | $120 |
$114
1,758
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs