ITAC Assessment: MA0298
ITAC logo
ITAC Assessment: MA0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product bearing balls and frictionless bearings
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 169
Plant Area 124,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,656
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,977 4,545,721
kWh
Natural Gas $77,698 9,994
MMBtu
LPG $2,976 143
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,165 - $14,165
167,644
kWh
- -
02 2.8113: Purchase gas directly from a contract gas supplier $31,402 $46,488 - - $31,402
03 2.7135: Install occupancy sensors $9,355 $2,620 $9,355
109,320
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,944 - $5,944
69,461
kWh
- -
05 2.2222: Convert liquid heaters from underfiring to immersion or submersion heating $3,590 $2,454 - $3,590
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,765 $3,077 $2,765
32,239
kWh
- -
07 2.7124: Make a practice of turning off lights when not needed $1,580 $474 $1,580
18,464
kWh
- -
08 2.2511: Insulate bare equipment $373 $1,024 - $373
-
MMBtu
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,095 $12,313 $6,095
71,219
kWh
- -
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $779 $783 $1,129
13,189
kWh
$(-350.0)
-
MMBtu
-
11 2.7122: Disconnect ballasts $677 - $677
7,913
kWh
- -
12 2.4131: Size electric motors for peak operating efficiency $409 $988 $409
4,689
kWh
- -
TOTAL RECOMMENDED $77,134 $70,221 $42,119
494,138
kWh
$3,613
-
MMBtu
$31,402
TOTAL IMPLEMENTED $30,282 $8,800 $26,669
313,599
kWh
$3,613
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs