Assessment Year | 2000 |
---|---|
Principal Product | Powder coating |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 111 |
Plant Area |
83,000
ft2
|
Annual Production | 250,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,013 | 1,088,804 |
kWh
|
$0.093 |
Electricity Demand | $8,951 | 5,943 |
kW-mo/yr
|
$1.51 |
Electricity Fees | $271 | - |
|
- |
Natural Gas | $117,349 | 17,962 |
MMBtu
|
$6.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,010 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,519 | $78,600 |
$20,078
208,968
kWh
|
$1,724
-
kW-mo/yr
|
$(-6,283.0)
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $14,410 | $50,000 | - | - |
$14,410
-
MMBtu
|
- | |
03 | 4.231: Purchase equipment instead of leasing | $5,244 | $30,000 | - | - | - | $5,244 | |
04 | 2.2136: Install / repair insulation on steam lines | $3,737 | $3,000 | - | - |
$3,737
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,111 | $500 |
$2,111
21,981
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $1,805 | $2,500 |
$1,805
75,029
kWh
|
- | - | - | |
07 | 4.821: Pay bills on time to avoid late fees | $895 | - | - | - | - | $895 | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $619 | $2,380 |
$619
6,448
kWh
|
- | - | - | |
09 | 2.2511: Insulate bare equipment | $592 | $1,700 |
$592
24,619
kWh
|
- | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $450 | $2,153 |
$450
4,689
kWh
|
- | - | - | |
11 | 2.7135: Install occupancy sensors | $450 | $150 |
$450
4,689
kWh
|
- | - | - | |
12 | 2.6212: Turn off equipment during breaks, reduce operating time | $298 | $300 |
$197
2,052
kWh
|
$101
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $46,130 | $171,283 |
$26,302
348,475
kWh
|
$1,825
-
kW-mo/yr
|
$11,864
-
MMBtu
|
$6,139 | ||
TOTAL IMPLEMENTED | $23,010 | $82,550 |
$22,836
237,690
kWh
|
$1,825
-
kW-mo/yr
|
$(-2,546.0)
-
MMBtu
|
$895 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs