ITAC Assessment: MA0452
ITAC logo
ITAC Assessment: MA0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Printed Household Items
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 120,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,568 684,349
kWh
Electricity Demand $8,523 2,348
kW-mo/yr
Electricity Fees $807 -
Natural Gas $40,799 6,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
01 3.4157: Replace water cooling on processes with air cooling $4,467 $7,563 - - - $2,983
-
Tgal
$1,484
-
gal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,793 $6,075 $1,597
23,740
kWh
$196
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $999 $480 - - $999
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $891 $400 - - $891
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $79 $35 $79
1,172
kWh
- - - -
TOTAL RECOMMENDED $8,229 $14,553 $1,676
24,912
kWh
$196
-
kW-mo/yr
$1,890
-
MMBtu
$2,983
-
Tgal
$1,484
-
gal
TOTAL IMPLEMENTED $5,545 $8,078 $79
1,172
kWh
- $999
-
MMBtu
$2,983
-
Tgal
$1,484
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs