Assessment Year | 1999 |
---|---|
Principal Product | Medical Needles |
NAICS |
n/a
|
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $1 M to 5M |
# of Employees | 25 |
Plant Area |
40,500
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,597 | 509,672 |
kWh
|
$0.050 |
Electricity Demand | $26,517 | 2,433 |
kW-mo/yr
|
$10.90 |
Electricity Fees | $952 | - |
|
- |
Natural Gas | $4,608 | 1,283 |
MMBtu
|
$3.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,063 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,662 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,232 | $3,510 |
$1,247
21,688
kWh
|
$251
-
kW-mo/yr
|
$(-266.0)
-
MMBtu
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $656 | $150 |
$573
9,965
kWh
|
- |
$83
-
MMBtu
|
|
03 | 2.7135: Install occupancy sensors | $927 | $325 |
$927
16,120
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $287 | $1,975 |
$287
4,982
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $792 | $60 |
$792
13,775
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $169 | $160 |
$169
2,931
kWh
|
- | - | |
TOTAL RECOMMENDED | $4,063 | $6,180 |
$3,995
69,461
kWh
|
$251
-
kW-mo/yr
|
$(-183.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,662 | $2,510 |
$2,579
44,842
kWh
|
- |
$83
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs