ITAC Assessment: MA0441
ITAC logo
ITAC Assessment: MA0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electrocoating
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 58
Plant Area 27,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,510
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,831 1,074,736
kWh
Electricity Demand $16,452 4,354
kW-mo/yr
Natural Gas $28,745 5,780
MMBtu
Fuel Oil #2 $4,124 1,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,789

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 4.652: Replace existing equipment with more suitable substitutes $21,168 $5,704 - - - $21,168
02 4.611: Begin a practice of predictive / preventative maintenance $43,200 $3,000 - - - $43,200
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $15,964 $40,000 $15,569
203,986
kWh
$5,067
-
kW-mo/yr
$(-4,672.0)
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,069 $26,625 $7,069
92,614
kWh
- - -
05 2.4321: Upgrade obsolete equipment $789 - $789
10,258
kWh
- - -
06 2.2511: Insulate bare equipment $632 $2,250 - - $632
-
MMBtu
-
TOTAL RECOMMENDED $88,822 $77,579 $23,427
306,858
kWh
$5,067
-
kW-mo/yr
$(-4,040.0)
-
MMBtu
$64,368
TOTAL IMPLEMENTED $65,789 $10,954 $789
10,258
kWh
- $632
-
MMBtu
$64,368
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs