Assessment Year | 1999 |
---|---|
Principal Product | Electrocoating |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 58 |
Plant Area |
27,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 3,510
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,831 | 1,074,736 |
kWh
|
$0.057 |
Electricity Demand | $16,452 | 4,354 |
kW-mo/yr
|
$3.78 |
Natural Gas | $28,745 | 5,780 |
MMBtu
|
$4.97 |
Fuel Oil #2 | $4,124 | 1,093 |
MMBtu
|
$3.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,822 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,789 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $21,168 | $5,704 | - | - | - | $21,168 | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $43,200 | $3,000 | - | - | - | $43,200 | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,964 | $40,000 |
$15,569
203,986
kWh
|
$5,067
-
kW-mo/yr
|
$(-4,672.0)
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,069 | $26,625 |
$7,069
92,614
kWh
|
- | - | - | |
05 | 2.4321: Upgrade obsolete equipment | $789 | - |
$789
10,258
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $632 | $2,250 | - | - |
$632
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $88,822 | $77,579 |
$23,427
306,858
kWh
|
$5,067
-
kW-mo/yr
|
$(-4,040.0)
-
MMBtu
|
$64,368 | ||
TOTAL IMPLEMENTED | $65,789 | $10,954 |
$789
10,258
kWh
|
- |
$632
-
MMBtu
|
$64,368 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs