ITAC Assessment: MA0436
ITAC logo
ITAC Assessment: MA0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rubber Seals
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 55,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $544,309 8,647,128
kWh
Electricity Demand $143,203 23,361
kW-mo/yr
Natural Gas $25,897 5,977
MMBtu
Fuel Oil #2 $1,170 268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $35,895 $41,600 $40,390
641,266
kWh
$10,074
-
kW-mo/yr
$(-14,569.0)
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,170 $27,774 $22,577
361,372
kWh
$1,593
-
kW-mo/yr
-
03 2.2611: Moderate cooling tower outlet temperature $7,745 $12,435 $7,745
122,802
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $15,831 $44,552 $14,942
237,104
kWh
$5,592
-
kW-mo/yr
$(-4,703.0)
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,698 $75,790 $13,217
209,848
kWh
$7,356
-
kW-mo/yr
$(-3,875.0)
-
MMBtu
06 2.7135: Install occupancy sensors $148 $77 $148
2,345
kWh
- -
07 2.7122: Disconnect ballasts $60 $100 $60
879
kWh
- -
TOTAL RECOMMENDED $100,547 $202,328 $99,079
1,575,616
kWh
$24,615
-
kW-mo/yr
$(-23,147.0)
-
MMBtu
TOTAL IMPLEMENTED $32,123 $40,386 $30,530
487,398
kWh
$1,593
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs