| Assessment Year | 1999 |
|---|---|
| Principal Product | Rubber Seals |
| NAICS |
n/a
|
| SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
55,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $544,309 | 8,647,128 |
kWh
|
$0.063 |
| Electricity Demand | $143,203 | 23,361 |
kW-mo/yr
|
$6.13 |
| Natural Gas | $25,897 | 5,977 |
MMBtu
|
$4.33 |
| Fuel Oil #2 | $1,170 | 268 |
MMBtu
|
$4.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $100,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,123 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $35,895 | $41,600 |
$40,390
641,266
kWh
|
$10,074
-
kW-mo/yr
|
$(-14,569.0)
-
MMBtu
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,170 | $27,774 |
$22,577
361,372
kWh
|
$1,593
-
kW-mo/yr
|
- | |
| 03 | 2.2611: Moderate cooling tower outlet temperature | $7,745 | $12,435 |
$7,745
122,802
kWh
|
- | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,831 | $44,552 |
$14,942
237,104
kWh
|
$5,592
-
kW-mo/yr
|
$(-4,703.0)
-
MMBtu
|
|
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $16,698 | $75,790 |
$13,217
209,848
kWh
|
$7,356
-
kW-mo/yr
|
$(-3,875.0)
-
MMBtu
|
|
| 06 | 2.7135: Install occupancy sensors | $148 | $77 |
$148
2,345
kWh
|
- | - | |
| 07 | 2.7122: Disconnect ballasts | $60 | $100 |
$60
879
kWh
|
- | - | |
| TOTAL RECOMMENDED | $100,547 | $202,328 |
$99,079
1,575,616
kWh
|
$24,615
-
kW-mo/yr
|
$(-23,147.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $32,123 | $40,386 |
$30,530
487,398
kWh
|
$1,593
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs