Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product High speed spin testing
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 9,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,310
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,191 1,261,137
kWh
Electricity Demand $64,841 6,721
kW-mo/yr
Fuel Oil #2 $2,491 399
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3212: Optimize plant power factor $3,090 $8,125 - $3,090
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $652 $2,185 $456
7,034
kWh
$196
-
kW-mo/yr
03 2.7135: Install occupancy sensors $230 $130 $230
4,689
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $71 $50 $71
1,465
kWh
-
TOTAL RECOMMENDED $4,043 $10,490 $757
13,188
kWh
$3,286
-
kW-mo/yr
TOTAL IMPLEMENTED $301 $180 $301
6,154
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs