Assessment Year | 1998 |
---|---|
Principal Product | Door and 4WD actuators |
NAICS |
n/a
|
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $5 M to 10M |
# of Employees | 300 |
Plant Area |
150,000
ft2
|
Annual Production | 7,200,000
pieces
|
Production Hrs. Annual | 6,425
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $267,479 | 4,133,939 |
kWh
|
$0.065 |
Electricity Demand | $155,989 | 11,486 |
kW-mo/yr
|
$13.58 |
Natural Gas | $26,081 | 3,457 |
MMBtu
|
$7.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,235 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,565 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,186 | $19,050 |
$1,730
22,567
kWh
|
$8,040
-
kW-mo/yr
|
$(-584.0)
-
MMBtu
|
- | |
02 | 2.3212: Optimize plant power factor | $5,715 | $7,055 | - |
$5,715
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $2,885 | $242 | - | - |
$2,885
-
MMBtu
|
- | |
04 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $4,093 | $4,800 | - | - | - |
$4,093
-
lb
|
|
05 | 3.5316: Contract a wood pallet recycling company | $3,533 | $2,700 | - | - | - |
$3,533
-
lb
|
|
06 | 2.7111: Reduce illumination to minimum necessary levels | $2,828 | $426 |
$2,065
21,981
kWh
|
$763
-
kW-mo/yr
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $2,159 | $1,840 |
$2,159
31,653
kWh
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $836 | $200 |
$836
13,189
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $31,235 | $36,313 |
$6,790
89,390
kWh
|
$14,518
-
kW-mo/yr
|
$2,301
-
MMBtu
|
$7,626
-
lb
|
||
TOTAL IMPLEMENTED | $18,565 | $26,731 |
$4,631
57,737
kWh
|
$14,518
-
kW-mo/yr
|
$(-584.0)
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs