ITAC Assessment: MA0422
ITAC logo
ITAC Assessment: MA0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product vinegar,mustard and apple juice
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 90,000
ft2
Annual Production 5,180
Tgal
Production Hrs. Annual 1,836
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,761 2,122,216
kWh
Electricity Demand $40,764 4,563
kW-mo/yr
Fuel Oil #4 $47,182 13,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,789

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings By-product Production Savings
01 3.1191: Change procedures / equipment / operating conditions $20,664 $120,000 - - - - $9,000
-
lb
$10,368 $1,296
02 2.2614: Use cooling tower or economizer to replace chiller cooling $3,889 $3,625 $(-191.0)
(-2,345)
kWh
$(-147.0)
-
kW-mo/yr
- $4,227
-
Tgal
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $764 - $764
9,379
kWh
- - - - - -
04 2.7224: Reduce space conditioning during non-working hours $452 $1,270 - - $452
-
MMBtu
- - - -
05 2.2437: Recover waste heat from equipment $337 $346 - - $337
-
MMBtu
- - - -
06 2.4221: Install compressor air intakes in coolest locations $236 $776 $236
2,931
kWh
- - - - - -
TOTAL RECOMMENDED $26,342 $126,017 $809
9,965
kWh
$(-147.0)
-
kW-mo/yr
$789
-
MMBtu
$4,227
-
Tgal
$9,000
-
lb
$10,368 $1,296
TOTAL IMPLEMENTED $1,789 $2,392 $1,000
12,310
kWh
- $789
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs