Assessment Year | 1999 |
---|---|
Principal Product | vinegar,mustard and apple juice |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 23 |
Plant Area |
90,000
ft2
|
Annual Production | 5,180
Tgal
|
Production Hrs. Annual | 1,836
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,761 | 2,122,216 |
kWh
|
$0.090 |
Electricity Demand | $40,764 | 4,563 |
kW-mo/yr
|
$8.93 |
Fuel Oil #4 | $47,182 | 13,268 |
MMBtu
|
$3.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,342 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,789 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #4 Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.1191: Change procedures / equipment / operating conditions | $20,664 | $120,000 | - | - | - | - |
$9,000
-
lb
|
$10,368 | $1,296 | |
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,889 | $3,625 |
$(-191.0)
(-2,345)
kWh
|
$(-147.0)
-
kW-mo/yr
|
- |
$4,227
-
Tgal
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $764 | - |
$764
9,379
kWh
|
- | - | - | - | - | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $452 | $1,270 | - | - |
$452
-
MMBtu
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $337 | $346 | - | - |
$337
-
MMBtu
|
- | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $236 | $776 |
$236
2,931
kWh
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $26,342 | $126,017 |
$809
9,965
kWh
|
$(-147.0)
-
kW-mo/yr
|
$789
-
MMBtu
|
$4,227
-
Tgal
|
$9,000
-
lb
|
$10,368 | $1,296 | ||
TOTAL IMPLEMENTED | $1,789 | $2,392 |
$1,000
12,310
kWh
|
- |
$789
-
MMBtu
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #4 Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs