ITAC Assessment: MA0413
ITAC logo
ITAC Assessment: MA0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Narrow Fabrics and Other Smallwears Mills
NAICS
n/a
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $10
M
to 50
M
# of Employees 383
Plant Area 276,000
ft2
Annual Production 8,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $458,884 6,201,934
kWh
Electricity Demand $85,364 6,680
kW-mo/yr
Fuel Oil #2 $58,804 10,944
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,342 $53,316 n/a $36,342
487,984
kWh
-
02 2.7124: Make a practice of turning off lights when not needed $4,782 $800 n/a $4,782
63,306
kWh
-
03 2.2623: Minimize condenser cooling water temperature $2,015 $2,000 n/a $2,015
26,671
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $572 $1,000 n/a $443
5,862
kWh
$129
-
MMBtu
TOTAL RECOMMENDED $43,711 $57,116 $43,582
583,823
kWh
$129
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs