Assessment Year | 1998 |
---|---|
Principal Product | Tissue paper |
NAICS |
n/a
|
SIC | 2676: Sanitary Paper Products |
Sales Range | n/a |
# of Employees | 28 |
Plant Area |
200,000
ft2
|
Annual Production | 24,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,710 | 1,412,075 |
kWh
|
$0.090 |
Electricity Demand | $28,555 | 3,449 |
kW-mo/yr
|
$8.28 |
Fuel Oil #6 | $98,163 | 26,669 |
MMBtu
|
$3.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,882 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,484 | $7,225 | n/a |
$8,484
95,838
kWh
|
- | - |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,796 | $11,700 | n/a |
$16,796
189,625
kWh
|
- | - |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,014 | $4,925 | n/a |
$5,014
56,565
kWh
|
- | - |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,403 | $4,925 | n/a |
$5,403
60,961
kWh
|
- | - |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,895 | $3,400 | n/a |
$1,895
21,395
kWh
|
- | - |
06 | 4.821: Pay bills on time to avoid late fees | $2,746 | - | n/a | - | - | $2,746 |
07 | 2.1213: Direct warmest air to combustion intake | $1,030 | $236 | n/a | - |
$1,030
-
MMBtu
|
- |
08 | 2.2511: Insulate bare equipment | $514 | $626 | n/a | - |
$514
-
MMBtu
|
- |
TOTAL RECOMMENDED | $41,882 | $33,037 |
$37,592
424,384
kWh
|
$1,544
-
MMBtu
|
$2,746 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs