ITAC Assessment: MA0392
ITAC logo
ITAC Assessment: MA0392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product metal castings
NAICS
n/a
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 110,000
ft2
Annual Production 500
ton
Production Hrs. Annual 2,250
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,514 1,839,097
kWh
Electricity Demand $95,161 15,972
kW-mo/yr
Natural Gas $67,663 10,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,984 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
01 4.522: Modify storage space to avoid rental of a warehouse $34,500 $21,950 - - - - $34,500
02 4.652: Replace existing equipment with more suitable substitutes $8,500 $3,000 - - $5,500
-
MMBtu
- $3,000
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,388 $6,000 $1,049
16,413
kWh
$1,845
-
kW-mo/yr
$(-506.0)
-
MMBtu
- -
04 2.7132: Install timers on light switches in little used areas $320 $268 $320
4,982
kWh
- - - -
05 3.8133: Convert to aqueous cleaning $276 $759 - - - $276
-
gal
-
TOTAL RECOMMENDED $45,984 $31,977 $1,369
21,395
kWh
$1,845
-
kW-mo/yr
$4,994
-
MMBtu
$276
-
gal
$37,500
TOTAL IMPLEMENTED $35,096 $22,977 $320
4,982
kWh
- - $276
-
gal
$34,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs