ITAC Assessment: MA0390
ITAC logo
ITAC Assessment: MA0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product High quality Injection Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 360,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,596 5,576,495
kWh
Electricity Demand $139,855 13,975
kW-mo/yr
Electricity Fees $6,506 -
Natural Gas $30,557 5,582
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,319 $11,700 $10,185
129,543
kWh
$2,134
-
kW-mo/yr
- -
02 4.821: Pay bills on time to avoid late fees $5,709 - - - - $5,709
03 2.3212: Optimize plant power factor $4,435 $9,975 - $4,435
-
kW-mo/yr
- -
04 2.8118: Check for accuracy of utility / power meters $3,585 $480 - - - $3,585
05 2.7135: Install occupancy sensors $852 $999 $852
13,482
kWh
- - -
06 3.8133: Convert to aqueous cleaning $548 - - - $548
-
gal
-
TOTAL RECOMMENDED $27,448 $23,154 $11,037
143,025
kWh
$6,569
-
kW-mo/yr
$548
-
gal
$9,294
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs