Assessment Year | 1997 |
---|---|
Principal Product | Coated Plastic Film |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
500,000
ft2
|
Annual Production | 11,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $813,425 | 9,674,678 |
kWh
|
$0.084 |
Electricity Demand | $118,951 | 22,053 |
kW-mo/yr
|
$5.39 |
Natural Gas | $839,457 | 271,689 |
MMBtu
|
$3.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $271,952 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.3113: Use other methods for neutralization | $194,188 | $908,000 |
$361,696
4,600,528
kWh
|
$114,996
-
MMBtu
|
- | - | - | - | $(-282,504.0) | |
02 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $42,000 | - | - | - | - | - | - |
$42,000
-
lb
|
- | |
03 | 3.4111: Use closed cycle process to minimize waste water production | $15,024 | $22,219 |
$(-421.0)
(-6,741)
kWh
|
- |
$15,745
-
Tgal
|
- |
$(-300.0)
-
gal
|
- | - | |
04 | 2.2628: Utilize a less expensive cooling method | $11,103 | $20,180 |
$13,213
211,606
kWh
|
- |
$(-2,110.0)
-
Tgal
|
- | - | - | - | |
05 | 3.4145: Use magnetic technology to treat water | $7,800 | $11,240 | - | - | - |
$7,800
-
gal
|
- | - | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $1,837 | $3,215 |
$418
5,862
kWh
|
$1,419
-
MMBtu
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $271,952 | $964,854 |
$374,906
4,811,255
kWh
|
$116,415
-
MMBtu
|
$13,635
-
Tgal
|
$7,800
-
gal
|
$(-300.0)
-
gal
|
$42,000
-
lb
|
$(-282,504.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs