ITAC Assessment: MA0382
ITAC logo
ITAC Assessment: MA0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed and Embossed PVC Sheet
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 180,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,515 11,441,384
kWh
Electricity Demand $235,480 24,024
kW-mo/yr
Electricity Fees $316,732 -
Natural Gas $221,844 50,487
MMBtu
Fuel Oil #4 $171,557 39,990
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $714,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,963

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #4 Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $1,954 $1,527 - - $989
-
MMBtu
$965
-
MMBtu
- -
02 4.652: Replace existing equipment with more suitable substitutes $2,296 $5,000 - $2,296
-
kW-mo/yr
- - - -
03 3.8137: Use soy or water-based inks $240,201 $300,000 - - $80,201
-
MMBtu
- $160,000
-
gal
-
04 3.3113: Use other methods for neutralization $457,830 $754,000 $264,159
4,411,196
kWh
$62,244
-
kW-mo/yr
- $40,177
-
MMBtu
- $91,250
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,752 $13,700 $2,910
48,652
kWh
- $3,968
-
MMBtu
$3,874
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,713 $200 $1,713
31,653
kWh
- - - - -
TOTAL RECOMMENDED $714,746 $1,074,427 $268,782
4,491,501
kWh
$64,540
-
kW-mo/yr
$85,158
-
MMBtu
$45,016
-
MMBtu
$160,000
-
gal
$91,250
TOTAL IMPLEMENTED $5,963 $6,727 $1,713
31,653
kWh
$2,296
-
kW-mo/yr
$989
-
MMBtu
$965
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #4 Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs