Assessment Year | 1997 |
---|---|
Principal Product | Printed and Embossed PVC Sheet |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
180,000
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $350,515 | 11,441,384 |
kWh
|
$0.031 |
Electricity Demand | $235,480 | 24,024 |
kW-mo/yr
|
$9.80 |
Electricity Fees | $316,732 | - |
|
- |
Natural Gas | $221,844 | 50,487 |
MMBtu
|
$4.39 |
Fuel Oil #4 | $171,557 | 39,990 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $714,746 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,963 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #4 Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $1,954 | $1,527 | - | - |
$989
-
MMBtu
|
$965
-
MMBtu
|
- | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $2,296 | $5,000 | - |
$2,296
-
kW-mo/yr
|
- | - | - | - | |
03 | 3.8137: Use soy or water-based inks | $240,201 | $300,000 | - | - |
$80,201
-
MMBtu
|
- |
$160,000
-
gal
|
- | |
04 | 3.3113: Use other methods for neutralization | $457,830 | $754,000 |
$264,159
4,411,196
kWh
|
$62,244
-
kW-mo/yr
|
- |
$40,177
-
MMBtu
|
- | $91,250 | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,752 | $13,700 |
$2,910
48,652
kWh
|
- |
$3,968
-
MMBtu
|
$3,874
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,713 | $200 |
$1,713
31,653
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $714,746 | $1,074,427 |
$268,782
4,491,501
kWh
|
$64,540
-
kW-mo/yr
|
$85,158
-
MMBtu
|
$45,016
-
MMBtu
|
$160,000
-
gal
|
$91,250 | ||
TOTAL IMPLEMENTED | $5,963 | $6,727 |
$1,713
31,653
kWh
|
$2,296
-
kW-mo/yr
|
$989
-
MMBtu
|
$965
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #4 Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs