Assessment Year | 1996 |
---|---|
Principal Product | Welded Steel Tubing, Rolled Steel Shapes |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 59 |
Plant Area |
33,000
ft2
|
Annual Production | 18,000,000
lb
|
Production Hrs. Annual | 6,300
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,543 | 1,516,413 |
kWh
|
$0.094 |
Natural Gas | $11,002 | 2,246 |
MMBtu
|
$4.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,302 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,851 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 3.7131: Use a rag recycle service | $2,866 | $1,664 | - | - |
$2,866
-
lb
|
|
02 | 2.7231: Use radiant heater for spot heating | $2,992 | $9,900 | - |
$2,992
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $558 | $225 |
$558
8,792
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $427 | $225 |
$427
6,741
kWh
|
- | - | |
05 | 2.3312: Install efficient rectifiers | $17,513 | $60,000 |
$17,513
274,033
kWh
|
- | - | |
06 | 2.3212: Optimize plant power factor | $405 | $711 |
$405
6,448
kWh
|
- | - | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $541 | $1,750 | - |
$541
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $25,302 | $74,475 |
$18,903
296,014
kWh
|
$3,533
-
MMBtu
|
$2,866
-
lb
|
||
TOTAL IMPLEMENTED | $3,851 | $2,114 |
$985
15,533
kWh
|
- |
$2,866
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs