ITAC Assessment: MA0376
ITAC logo
ITAC Assessment: MA0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Small Firearms
NAICS
n/a
SIC 3484: Small Arms
Sales Range $1
M
to 5
M
# of Employees 234
Plant Area 168,000
ft2
Annual Production 230,000
pieces
Production Hrs. Annual 5,100
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,718 2,279,601
kWh
Electricity Demand $96,934 10,063
kW-mo/yr
Natural Gas $81,367 17,659
MMBtu
Fuel Oil #2 $25,315 5,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,015

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
01 3.3131: Use evaporation to concentrate material $24,817 $16,000 - - $24,817
-
gal
-
02 3.3112: Utilize oxidation/reduction for neutralization $18,500 $3,200 - - - $18,500
-
gal
03 2.7314: Reduce ventilation air $1,830 $1,150 $1,830
74,443
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,918 $13,680 $6,572
63,892
kWh
$2,346
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $450 $516 $450
6,741
kWh
- - -
TOTAL RECOMMENDED $54,515 $34,546 $8,852
145,076
kWh
$2,346
-
kW-mo/yr
$24,817
-
gal
$18,500
-
gal
TOTAL IMPLEMENTED $36,015 $31,346 $8,852
145,076
kWh
$2,346
-
kW-mo/yr
$24,817
-
gal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs