ITAC Assessment: MA0362
ITAC logo
ITAC Assessment: MA0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product paper
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $5
M
to 10
M
# of Employees 89
Plant Area 333,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,482 5,470,692
kWh
Electricity Demand $54,792 26,547
kW-mo/yr
Electricity Fees $6,996 -
Other Energy $411,341 80,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $207,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $164,672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings Water Disposal Savings Primary Raw Material Savings Water Consumption Savings By-product Production Savings
01 2.3322: Use existing dam to generate electricity $109,702 $40,000 $102,709
1,974,209
kWh
- - - - - - $6,993
02 3.4111: Use closed cycle process to minimize waste water production $30,286 $11,000 - - - - $3,301
-
Tgal
$26,985 - -
03 2.2113: Repair or replace steam traps $29,467 $6,350 - - - $29,467
-
MMBtu
- - - -
04 2.2136: Install / repair insulation on steam lines $18,658 $18,595 - - - $18,658
-
MMBtu
- - - -
05 2.8123: Pay utility bills on time $10,690 - - - $3,512 - - - $7,178
-
Tgal
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,026 $14,436 $5,645
92,321
kWh
$381
-
kW-mo/yr
- - - - - -
07 2.7135: Install occupancy sensors $1,613 $280 $1,613
26,377
kWh
- - - - - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $878 $902 $878
14,361
kWh
- - - - - - -
TOTAL RECOMMENDED $207,320 $91,563 $110,845
2,107,268
kWh
$381
-
kW-mo/yr
$3,512 $48,125
-
MMBtu
$3,301
-
Tgal
$26,985 $7,178
-
Tgal
$6,993
TOTAL IMPLEMENTED $164,672 $84,031 $108,354
2,066,530
kWh
$381
-
kW-mo/yr
- $18,658
-
MMBtu
$3,301
-
Tgal
$26,985 - $6,993
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings Water Disposal Savings Primary Raw Material Savings Water Consumption Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs