Assessment Year | 1996 |
---|---|
Principal Product | Flexographic printing presses |
NAICS |
n/a
|
SIC | 3555: Printing Trades Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
125,000
ft2
|
Annual Production | 4
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,097 | 1,155,920 |
kWh
|
$0.074 |
Electricity Demand | $18,015 | 2,342 |
kW-mo/yr
|
$7.69 |
Electricity Fees | $3,874 | - |
|
- |
Natural Gas | $17,330 | 2,636 |
MMBtu
|
$6.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,812 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,353 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $9,187 | $2,640 | - |
$8,704
-
MMBtu
|
$483
-
Tgal
|
- | - | - | |
02 | 2.2113: Repair or replace steam traps | $5,482 | $3,408 | - |
$6,682
-
MMBtu
|
- | - | - | $(-1,200.0) | |
03 | 3.3131: Use evaporation to concentrate material | $5,695 | $295 | - | - | - |
$5,695
-
gal
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,759 | $1,400 |
$4,939
100,528
kWh
|
- | - | - | - | $(-180.0) | |
05 | 2.7261: Install timers and/or thermostats | $5,189 | $4,200 |
$4,264
86,753
kWh
|
$925
-
MMBtu
|
- | - | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $764 | $2,493 |
$1,296
26,377
kWh
|
$(-532.0)
-
MMBtu
|
- | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $432 | - |
$432
5,862
kWh
|
- | - | - | - | - | |
08 | 3.5217: Reuse / recycle/ sell paper products | $304 | $79 | - | - | - | - |
$304
-
lb
|
- | |
TOTAL RECOMMENDED | $31,812 | $14,515 |
$10,931
219,520
kWh
|
$15,779
-
MMBtu
|
$483
-
Tgal
|
$5,695
-
gal
|
$304
-
lb
|
$(-1,380.0) | ||
TOTAL IMPLEMENTED | $25,353 | $11,727 |
$9,635
193,143
kWh
|
$16,311
-
MMBtu
|
$483
-
Tgal
|
- |
$304
-
lb
|
$(-1,380.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs