ITAC Assessment: MA0361
ITAC logo
ITAC Assessment: MA0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Flexographic printing presses
NAICS
n/a
SIC 3555: Printing Trades Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 125,000
ft2
Annual Production 4
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,097 1,155,920
kWh
Electricity Demand $18,015 2,342
kW-mo/yr
Electricity Fees $3,874 -
Natural Gas $17,330 2,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $9,187 $2,640 - $8,704
-
MMBtu
$483
-
Tgal
- - -
02 2.2113: Repair or replace steam traps $5,482 $3,408 - $6,682
-
MMBtu
- - - $(-1,200.0)
03 3.3131: Use evaporation to concentrate material $5,695 $295 - - - $5,695
-
gal
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,759 $1,400 $4,939
100,528
kWh
- - - - $(-180.0)
05 2.7261: Install timers and/or thermostats $5,189 $4,200 $4,264
86,753
kWh
$925
-
MMBtu
- - - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $764 $2,493 $1,296
26,377
kWh
$(-532.0)
-
MMBtu
- - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $432 - $432
5,862
kWh
- - - - -
08 3.5217: Reuse / recycle/ sell paper products $304 $79 - - - - $304
-
lb
-
TOTAL RECOMMENDED $31,812 $14,515 $10,931
219,520
kWh
$15,779
-
MMBtu
$483
-
Tgal
$5,695
-
gal
$304
-
lb
$(-1,380.0)
TOTAL IMPLEMENTED $25,353 $11,727 $9,635
193,143
kWh
$16,311
-
MMBtu
$483
-
Tgal
- $304
-
lb
$(-1,380.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs