ITAC Assessment: MA0358
ITAC logo
ITAC Assessment: MA0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product atheletic shoe cleats
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 83
Plant Area 40,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,910 1,608,734
kWh
Electricity Demand $29,478 3,725
kW-mo/yr
Electricity Fees $1,487 -
Natural Gas $7,200 1,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 3.5248: Separate and recycle scrap metal to foundry or for sale $3,000 $2,800 - - - $3,000
02 2.4322: Use or replace with energy efficient substitutes $2,147 $4,650 $2,561
29,894
kWh
- $(-414.0)
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,080 - $1,080
12,603
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $742 $1,100 $649
7,034
kWh
$93
-
kW-mo/yr
- -
05 2.2623: Minimize condenser cooling water temperature $377 - $377
4,396
kWh
- - -
TOTAL RECOMMENDED $7,346 $8,550 $4,667
53,927
kWh
$93
-
kW-mo/yr
$(-414.0)
-
MMBtu
$3,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs