Assessment Year | 1996 |
---|---|
Principal Product | looseleaf binders |
NAICS |
n/a
|
SIC | 2782: Blankbooks, Looseleaf Binders and Devices |
Sales Range | $10 M to 50M |
# of Employees | 117 |
Plant Area |
205,000
ft2
|
Annual Production | 1,818,181
pieces
|
Production Hrs. Annual | 3,379
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,080 | 2,002,345 |
kWh
|
$0.076 |
Electricity Demand | $18,237 | 7,069 |
kW-mo/yr
|
$2.58 |
Electricity Fees | $7,864 | - |
|
- |
Other Energy | $29,619 | 31,000 |
MMBtu
|
$0.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,002 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,882 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $29,400 | $118,450 | - | - |
$29,400
-
lb
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,644 | $3,000 |
$2,644
36,928
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,838 | - |
$1,838
24,033
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,672 | $10,000 |
$2,784
32,532
kWh
|
$(-1,112.0)
-
MMBtu
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $448 | - |
$448
5,862
kWh
|
- | - | |
TOTAL RECOMMENDED | $36,002 | $131,450 |
$7,714
99,355
kWh
|
$(-1,112.0)
-
MMBtu
|
$29,400
-
lb
|
||
TOTAL IMPLEMENTED | $33,882 | $121,450 |
$4,482
60,961
kWh
|
- |
$29,400
-
lb
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs