ITAC Assessment: MA0356
ITAC logo
ITAC Assessment: MA0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product looseleaf binders
NAICS
n/a
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area 205,000
ft2
Annual Production 1,818,181
pieces
Production Hrs. Annual 3,379
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,080 2,002,345
kWh
Electricity Demand $18,237 7,069
kW-mo/yr
Electricity Fees $7,864 -
Other Energy $29,619 31,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $29,400 $118,450 - - $29,400
-
lb
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,644 $3,000 $2,644
36,928
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,838 - $1,838
24,033
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,672 $10,000 $2,784
32,532
kWh
$(-1,112.0)
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $448 - $448
5,862
kWh
- -
TOTAL RECOMMENDED $36,002 $131,450 $7,714
99,355
kWh
$(-1,112.0)
-
MMBtu
$29,400
-
lb
TOTAL IMPLEMENTED $33,882 $121,450 $4,482
60,961
kWh
- $29,400
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs