Assessment Year | 1995 |
---|---|
Principal Product | Heat Treatment of Steel Parts |
NAICS |
n/a
|
SIC | 3398: Metal Heat Treating |
Sales Range | $10 M to 50M |
# of Employees | 31 |
Plant Area |
41,500
ft2
|
Annual Production | 9,968,000
lb
|
Production Hrs. Annual | 7,500
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $246,444 | 3,270,516 |
kWh
|
$0.075 |
Natural Gas | $218,487 | 41,930 |
MMBtu
|
$5.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,097 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,066 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,329 | $20,441 |
$13,551
145,955
kWh
|
$(-3,222.0)
-
MMBtu
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,019 | $1,750 | - |
$3,019
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,154 | $8,175 |
$2,154
28,429
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $364 | $80 |
$364
5,275
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $319 | $900 |
$319
4,689
kWh
|
- | - | - | |
06 | 3.5111: Filter and reuse hydraulic oil | $29,912 | $51,750 | - | - |
$29,912
-
gal
|
- | |
07 | 3.6194: Ship hydraulic oil to secondary fuel program | $1,000 | - | - | - | - |
$1,000
-
lb
|
|
TOTAL RECOMMENDED | $47,097 | $83,096 |
$16,388
184,348
kWh
|
$(-203.0)
-
MMBtu
|
$29,912
-
gal
|
$1,000
-
lb
|
||
TOTAL IMPLEMENTED | $32,066 | $59,925 |
$2,154
28,429
kWh
|
- |
$29,912
-
gal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs