| Assessment Year | 1995 |
|---|---|
| Principal Product | Heat Treatment of Steel Parts |
| NAICS |
n/a
|
| SIC | 3398: Metal Heat Treating |
| Sales Range | $10 M to 50M |
| # of Employees | 31 |
| Plant Area |
41,500
ft2
|
| Annual Production | 9,968,000
lb
|
| Production Hrs. Annual | 7,500
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $246,444 | 3,270,516 |
kWh
|
$0.075 |
| Natural Gas | $218,487 | 41,930 |
MMBtu
|
$5.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,097 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,066 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,329 | $20,441 |
$13,551
145,955
kWh
|
$(-3,222.0)
-
MMBtu
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,019 | $1,750 | - |
$3,019
-
MMBtu
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,154 | $8,175 |
$2,154
28,429
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $364 | $80 |
$364
5,275
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $319 | $900 |
$319
4,689
kWh
|
- | - | - | |
| 06 | 3.5111: Filter and reuse hydraulic oil | $29,912 | $51,750 | - | - |
$29,912
-
gal
|
- | |
| 07 | 3.6194: Ship hydraulic oil to secondary fuel program | $1,000 | - | - | - | - |
$1,000
-
lb
|
|
| TOTAL RECOMMENDED | $47,097 | $83,096 |
$16,388
184,348
kWh
|
$(-203.0)
-
MMBtu
|
$29,912
-
gal
|
$1,000
-
lb
|
||
| TOTAL IMPLEMENTED | $32,066 | $59,925 |
$2,154
28,429
kWh
|
- |
$29,912
-
gal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs