ITAC Assessment: MA0345
ITAC logo
ITAC Assessment: MA0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sand Castings
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 116
Plant Area 38,000
ft2
Annual Production 451,031
lb
Production Hrs. Annual 2,125
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,735 2,219,226
kWh
Natural Gas $31,573 5,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings
01 2.7224: Reduce space conditioning during non-working hours $7,752 $485 - $7,752
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,830 $39,252 $6,830
53,048
kWh
- - -
03 2.3212: Optimize plant power factor $2,255 $4,500 $2,255
12,603
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,702 $1,200 $1,702
21,102
kWh
- - -
05 2.4314: Use synthetic lubricant $941 $300 $941
10,551
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $549 - $549
6,155
kWh
- - -
07 2.6231: Utilize controls to operate equipment only when needed $496 $165 $496
5,569
kWh
- - -
08 2.6231: Utilize controls to operate equipment only when needed $404 $500 $404
4,396
kWh
- - -
09 3.4113: Treat and reuse rinse waters $3,961 $20,000 - - $3,961
-
Tgal
-
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $950 $2,700 - - - $950
-
lb
TOTAL RECOMMENDED $25,840 $69,102 $13,177
113,424
kWh
$7,752
-
MMBtu
$3,961
-
Tgal
$950
-
lb
TOTAL IMPLEMENTED $19,220 $44,102 $10,518
96,425
kWh
$7,752
-
MMBtu
- $950
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs