| Assessment Year | 1995 |
|---|---|
| Principal Product | Sand Castings |
| NAICS |
n/a
|
| SIC | 3429: Hardware, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 116 |
| Plant Area |
38,000
ft2
|
| Annual Production | 451,031
lb
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $286,735 | 2,219,226 |
kWh
|
$0.13 |
| Natural Gas | $31,573 | 5,221 |
MMBtu
|
$6.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,220 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $7,752 | $485 | - |
$7,752
-
MMBtu
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,830 | $39,252 |
$6,830
53,048
kWh
|
- | - | - | |
| 03 | 2.3212: Optimize plant power factor | $2,255 | $4,500 |
$2,255
12,603
kWh
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,702 | $1,200 |
$1,702
21,102
kWh
|
- | - | - | |
| 05 | 2.4314: Use synthetic lubricant | $941 | $300 |
$941
10,551
kWh
|
- | - | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $549 | - |
$549
6,155
kWh
|
- | - | - | |
| 07 | 2.6231: Utilize controls to operate equipment only when needed | $496 | $165 |
$496
5,569
kWh
|
- | - | - | |
| 08 | 2.6231: Utilize controls to operate equipment only when needed | $404 | $500 |
$404
4,396
kWh
|
- | - | - | |
| 09 | 3.4113: Treat and reuse rinse waters | $3,961 | $20,000 | - | - |
$3,961
-
Tgal
|
- | |
| 10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $950 | $2,700 | - | - | - |
$950
-
lb
|
|
| TOTAL RECOMMENDED | $25,840 | $69,102 |
$13,177
113,424
kWh
|
$7,752
-
MMBtu
|
$3,961
-
Tgal
|
$950
-
lb
|
||
| TOTAL IMPLEMENTED | $19,220 | $44,102 |
$10,518
96,425
kWh
|
$7,752
-
MMBtu
|
- |
$950
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs