| Assessment Year | 1995 |
|---|---|
| Principal Product | Miniature die castings |
| NAICS |
n/a
|
| SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
| Sales Range | $5 M to 10M |
| # of Employees | 80 |
| Plant Area |
60,000
ft2
|
| Annual Production | 1,360,000
lb
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $143,767 | 1,543,083 |
kWh
|
$0.093 |
| Natural Gas | $105,632 | 15,119 |
MMBtu
|
$6.99 |
| LPG | $2,960 | 592 |
MMBtu
|
$5.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,362 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,750 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $3,618 | $1,883 |
$1,311
14,068
kWh
|
$2,307
-
MMBtu
|
- | - | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,067 | $4,632 |
$3,081
33,118
kWh
|
$986
-
MMBtu
|
- | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $1,545 | $2,500 | - |
$1,545
-
MMBtu
|
- | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,557 | $1,000 |
$1,557
16,706
kWh
|
- | - | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $922 | - |
$922
28,136
kWh
|
- | - | - | - | |
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $453 | $1,190 |
$453
4,982
kWh
|
- | - | - | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $382 | - |
$382
4,103
kWh
|
- | - | - | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $378 | $255 |
$378
4,103
kWh
|
- | - | - | - | |
| 09 | 3.5242: Recover metals from spent solutions and recycle | $28,487 | $53,330 | - | - | - | - |
$28,487
-
lb
|
|
| 10 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $7,953 | $5,526 | - | - |
$720
-
Tgal
|
$1,656
-
gal
|
$5,577
-
lb
|
|
| TOTAL RECOMMENDED | $49,362 | $70,316 |
$8,084
105,216
kWh
|
$4,838
-
MMBtu
|
$720
-
Tgal
|
$1,656
-
gal
|
$34,064
-
lb
|
||
| TOTAL IMPLEMENTED | $43,750 | $63,184 |
$5,003
72,098
kWh
|
$2,307
-
MMBtu
|
$720
-
Tgal
|
$1,656
-
gal
|
$34,064
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs