ITAC Assessment: MA0324
ITAC logo
ITAC Assessment: MA0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product honeycomb die cut products
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 94
Plant Area 58,000
ft2
Annual Production 41,600
thousand feet
Production Hrs. Annual 6,448
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,553 1,051,290
kWh
Natural Gas $23,396 2,855
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,482 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $53,561 $21,794 $55,089
464,830
kWh
$(-1,528.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,426 $9,200 $17,924
151,231
kWh
$(-498.0)
-
MMBtu
03 2.2515: Use optimum thickness insulation $9,394 $10,179 - $9,394
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,424 $14,935 $8,424
70,340
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,835 $1,500 $5,835
49,238
kWh
-
06 2.7231: Use radiant heater for spot heating $1,987 $1,300 - $1,987
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $855 $1,373 $885
7,327
kWh
$(-30.0)
-
MMBtu
TOTAL RECOMMENDED $97,482 $60,281 $88,157
742,966
kWh
$9,325
-
MMBtu
TOTAL IMPLEMENTED $14,259 $16,435 $14,259
119,578
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs