Assessment Year | 1995 |
---|---|
Principal Product | honeycomb die cut products |
NAICS |
n/a
|
SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 94 |
Plant Area |
58,000
ft2
|
Annual Production | 41,600
thousand feet
|
Production Hrs. Annual | 6,448
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,553 | 1,051,290 |
kWh
|
$0.12 |
Natural Gas | $23,396 | 2,855 |
MMBtu
|
$8.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $97,482 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,259 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $53,561 | $21,794 |
$55,089
464,830
kWh
|
$(-1,528.0)
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $17,426 | $9,200 |
$17,924
151,231
kWh
|
$(-498.0)
-
MMBtu
|
|
03 | 2.2515: Use optimum thickness insulation | $9,394 | $10,179 | - |
$9,394
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,424 | $14,935 |
$8,424
70,340
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,835 | $1,500 |
$5,835
49,238
kWh
|
- | |
06 | 2.7231: Use radiant heater for spot heating | $1,987 | $1,300 | - |
$1,987
-
MMBtu
|
|
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $855 | $1,373 |
$885
7,327
kWh
|
$(-30.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $97,482 | $60,281 |
$88,157
742,966
kWh
|
$9,325
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,259 | $16,435 |
$14,259
119,578
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs