ITAC Assessment: MA0323
ITAC logo
ITAC Assessment: MA0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Frozen Pasta Products
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 8,000
ft2
Annual Production 4,160,000
lb
Production Hrs. Annual 4,290
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,092 651,817
kWh
Natural Gas $6,693 907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $1,470 $4,000 $1,470
14,947
kWh
-
02 2.7231: Use radiant heater for spot heating $1,300 $2,820 - $1,300
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $685 $500 $685
8,792
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $346 $511 $346
3,517
kWh
-
TOTAL RECOMMENDED $3,801 $7,831 $2,501
27,256
kWh
$1,300
-
MMBtu
TOTAL IMPLEMENTED $685 $500 $685
8,792
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs