ITAC Assessment: MA0321
ITAC logo
ITAC Assessment: MA0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Wire Mesh
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 162,000
ft2
Annual Production 8,000
ton
Production Hrs. Annual 8,184
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,845 1,148,007
kWh
Natural Gas $355,528 65,113
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,018

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $22,525 $60,000 $22,525
-
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,118 $3,888 $2,118
20,516
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,493 $23,880 $5,493
83,236
kWh
TOTAL RECOMMENDED $30,136 $87,768 $30,136
103,752
kWh
TOTAL IMPLEMENTED $28,018 $83,880 $28,018
83,236
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs