ITAC Assessment: MA0319
ITAC logo
ITAC Assessment: MA0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Retractable Cords
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 63,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,266 2,680,832
kWh
Fuel Oil #2 $32,576 6,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,463 $10,240 $16,401
208,089
kWh
$(-4,938.0)
-
MMBtu
02 2.3212: Optimize plant power factor $5,357 $12,000 $5,357
-
kWh
-
03 2.2437: Recover waste heat from equipment $4,412 $10,920 $4,412
55,979
kWh
-
04 2.4314: Use synthetic lubricant $2,218 $555 $2,218
28,136
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $919 $3,119 $1,247
15,826
kWh
$(-328.0)
-
MMBtu
06 2.2628: Utilize a less expensive cooling method $2,125 $2,197 $2,125
26,964
kWh
-
TOTAL RECOMMENDED $26,494 $39,031 $31,760
334,994
kWh
$(-5,266.0)
-
MMBtu
TOTAL IMPLEMENTED $5,357 $12,000 $5,357
-
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs