ITAC Assessment: MA0315
ITAC logo
ITAC Assessment: MA0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product potato chips, pop corn
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 60,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,407 200,762
kWh
Natural Gas $1,140 118
MMBtu
Fuel Oil #2 $42,134 8,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1331: Burn a less expensive grade of fuel $10,053 $33,627 - $10,053
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,672 $3,805 $2,672
21,102
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,932 $1,776 $2,227
17,585
kWh
$(-295.0)
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,707 $1,678 $1,707
12,603
kWh
-
05 2.2511: Insulate bare equipment $1,350 $4,238 $853
6,741
kWh
$497
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $933 - $933
8,792
kWh
-
TOTAL RECOMMENDED $18,647 $45,124 $8,392
66,823
kWh
$10,255
-
MMBtu
TOTAL IMPLEMENTED $933 - $933
8,792
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs